Installation and Start-Up | 3-1
InstallatIon
The operations in this chapter should be performed only by quali-
fied service personnel experienced in electrical safety techniques.
There are no operator-serviceable components inside the WDG
system. Never service the controller or sensor unless power has been
removed from the controller and sensor, and the sensor has been
allowed to cool for at least one hour. Also, always use gloves when
working on the sensor.
Do not turn on the aspirator until the sensor has been turned on
and is hot - preferably 24 hours. If you turn off the analyzer or the
process is shut down, turn off the aspirator air to avoid plugging
problems!
analyzer location
Observe the following guidelines when selecting an analyzer installation loca-
tion:
1. Select a readily accessible position for the analyzer to allow for routine main-
tenance. Comfort levels for maintenance personnel should be considered in
placement of the sensor and control interface.
2. The installation location should be free from excessive vibration and the
ambient temperature is required to be within the limits listed in the specifica
-
tions. If the ambient temperature is outside the specified limits or the vibra
-
tion is excessive, please contact Thermox Sales or Service Department at
(412) 828-9040. We have special options to address ambient temperatures
outside the listed specifications and special mounting solutions can be pro
-
vided for excessive vibration installation locations.
NOTE
Содержание Thermox WDG Insitu
Страница 12: ...xii Thermox Series 2000 WDG Insitu This page intentionally left blank...
Страница 20: ...1 8 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 24: ...2 4 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 28: ...3 4 Thermox Series 2000 WDG Insitu Analyzer Figure 3 2 Insitu senor mounting...
Страница 44: ...3 20 Thermox Series 2000 WDG Insitu Analyzer Figure 3 19 Sensor connections...
Страница 51: ...Installation and Start Up 3 27 Figure 3 23 Series 2000 2 Wire RS 485 communications connections...
Страница 53: ...Installation and Start Up 3 29 Figure 3 24 Series 2000 4 wire RS 485 communication connections...
Страница 114: ...6 16 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 128: ...7 14 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 154: ...A 26 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 158: ...B 4 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...
Страница 164: ...D 2 Thermox Series 2000 WDG Insitu Analyzer This page intentionally left blank...