7-13
POWR
Power unit
15. Connect the vapor gas hose
K
to the
housing (STBD), and then fasten it using
the plastic tie
L
.
16. Connect the flushing hose
M
, and then
fasten it using the plastic tie
N
.
17. Install the speed sensor coupler
f
to the
bracket
O
, and then install the engine
ECM cover
P
.
18. Connect the cooling water hose
Q
, and
then fasten it using the clamp
R
.
19. Install the wiring harness
S
to the hold-
ers on the bracket
T
.
20. Connect the trim sensor coupler
g
, and
then install the trim sensor coupler to the
tab on the bracket.
21. Install the alert indicator coupler
h
to the
bracket.
22. Connect the 6Y8 Multifunction Meter
coupler
k
, and then install the 6Y8 Multi-
function Meter coupler to the tab on the
bracket.
23. Connect the 10-pin coupler
m
, and then
fasten the 10-pin coupler to the holders
on the bracket
T
.
24. Install the water detection switch coupler
n
and isolator coupler
p
to the bracket
U
.
25. Connect the PTT switch coupler
r
, and
then install the PTT switch coupler to the
bracket
U
.
STBD
K
L
f
O
M
N
P
Q
R
T
g
S
h
T
m
k
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...