5-62
5
7.
Check the shift cut switch for continuity.
Replace if out of specification.
8.
Disconnect the special service tool.
9.
Remove the engine ECM cover.
10. Remove the engine ECM, and then dis-
connect the engine ECM coupler
e
.
11. Check the wiring harness for continuity.
12. Connect the engine ECM coupler.
NOTICE:
Make sure that the rubber
seal is installed properly in the engine
ECM coupler.
13. Install the engine ECM, and then tighten
the engine ECM bolts to the specified
torque.
14. Install the engine ECM cover.
Test harness (2 pins)
1
: 90890-06867
Shift cut switch resistance (reference
data):
Blue/Yellow (L/Y)–Black (B)
4.5–4.9 k
Ω
Test harness (2 pins)
1
: 90890-06867
G/W
G
B
L/Y
1
b
b
B
L/Y
1
G/W
G
B
L/Y
1
c
c
d
d
1
B
L/Y
Switch
position
Lead color
L/Y
B
Free
c
Pushed
d
C
C
C
C
C
C
C
C
Wiring harness continuity:
a
Terminal 1–
e
Terminal 18
a
Terminal 2–
e
Terminal 6
Engine ECM bolt:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
e
a
2
1
e
18
6
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...