7-40
7
TIP:
Before installing the timing belt, make sure
that the marks on the crankshaft and cylinder
block are aligned. Also, make sure that the
marks on the VCT assemblies and driven
sprockets are aligned. See steps 6 and 7 in
“Removing the timing belt” (7-38).
3.
Install the timing belt onto the VCT
assemblies and driven sprockets by
aligning belt position marks
e
,
f
,
g
,
and
h
with the “
L
L
L
L
” marks in the order
listed.
k
Belt teeth number
4.
Install the collar
6
, push the timing belt
inward using the pulley
7
, and then
install the pulley.
NOTICE:
Make sure
that the pulley
7
is installed properly
onto the collar
6
.
5.
Install the washer, and then tighten the
pulley bolt
8
to the specified torque.
TIP:
When installing the pulley, make sure to keep
the belt position marks and the “
L
L
L
L
” marks
aligned as specified in step 3.
6.
Adjust the timing belt installation height
m
to specification.
7.
Insert a hexagon wrench into the hole
n
,
turn the timing belt tensioner gradually
clockwise, remove the pin
9
, and then
return the timing belt tensioner slowly.
160
133
88
60
0 1 2 3
c
h
g
f
e
k
h
g
f
e
Pulley bolt
8
:
39 N·m (3.9 kgf·m, 28.8 ft·lb)
Timing belt installation height
m
:
2.0 mm (0.08 in)
7
8
6
m
9
n
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...