BRKT
Bracket unit
9-41
TIP:
If the PTT rams do not move up and down
easily, push and pull on the PTT rams to
assist operation.
6.
Check the fluid level when the PTT rams
are fully extended. If the fluid level is low,
add sufficient fluid, and then repeat steps
4 and 5.
Installing the PTT unit
• After tilting the swivel bracket up, make
sure to support it using the tilt stop
lever.
• When installing the PTT unit with the
power unit installed, make sure to sus-
pend the outboard motor.
1.
Connect the PTT motor leads
a
to the
battery terminals to retract the PTT rams.
2.
Fully tilt the swivel bracket up, and then
support it using the tilt stop lever
1
.
3.
Install the bushings
2
and
3
to the tilt
ram end and swivel bracket.
4.
Install the PTT unit
4
, and then tighten
the PTT unit bolts
5
to the specified
torque.
Ram
PTT motor lead
Battery
terminal
Down
Light green (Lg)
Sky blue (Sb)
Up
Sky blue (Sb)
Light green (Lg)
Lg
Sb
Lg
Sb
Ram
PTT motor lead
Battery
terminal
Down
Light green (Lg)
Sky blue (Sb)
Lg
Sb
a
1
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...