7-10
7
21. Disconnect the shift cut switch coupler
m
, and then remove the wiring harness
and neutral switch lead from the holders
J
and
K
.
22. Remove the neutral switch coupler
n
,
and then disconnect the neutral switch
coupler from the bracket
L
.
23. Remove the cooling water hose
M
from
the holder
N
, and then disconnect the
cooling water hose.
24. Remove the holders
O
, plastic tie
P
,
and caps
Q
, and then disconnect the
PTT relay terminals
p
.
25. Remove the aprons
R
and cover
S
.
26. Retract the cowling lock levers (PORT
and STBD).
NOTICE:
Make sure that
the cowling lock levers are retracted
and the engine stoppers are installed
before removing the power unit. Oth-
erwise, the fuel rails could be dam-
aged.
27. Hook a lifting harnesses to the engine
hangers
T
, and then suspend the power
unit
U
.
K
J
I
H
N M
L
m
n
Q
Q
O
P
O
STBD
p
p
R
S
R
T
POR
STBD
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...