5-54
5
8.
Check the wiring harness for continuity.
TIP:
Make sure that there is continuity between
terminal 3 of the ignition coil couplers
a
and
one of the terminals of the fuse holder cou-
pler
c
.
9.
Connect the fuse holder coupler, and
then install the fuse holder.
10. Install the intake manifold (STBD). See
“Installing the intake manifold” (6-18).
11. Connect the engine ECM coupler.
NOTICE:
Make sure that the rubber
seal is installed properly in the engine
ECM coupler.
1
c
54 53
63 62
71 70
b
a
c
3 2 1
9
10
22 21 20 19 18 17 16
8
7 6
5 4
3 2 1
Wiring harness continuity:
Ignition coil #1
a
Terminal 1–
b
Terminal 71
a
Terminal 2–Ground
a
Terminal 3–
c
Terminals 1–10 and 16–22
Ignition coil #2
a
Terminal 1–
b
Terminal 70
a
Terminal 2–Ground
a
Terminal 3–
c
Terminals 1–10 and 16–22
Ignition coil #3
a
Terminal 1–
b
Terminal 63
a
Terminal 2–Ground
a
Terminal 3–
c
Terminals 1–10 and 16–22
Ignition coil #4
a
Terminal 1–
b
Terminal 62
a
Terminal 2–Ground
a
Terminal 3–
c
Terminals 1–10 and 16–22
Ignition coil #5
a
Terminal 1–
b
Terminal 54
a
Terminal 2–Ground
a
Terminal 3–
c
Terminals 1–10 and 16–22
Ignition coil #6
a
Terminal 1–
b
Terminal 53
a
Terminal 2–Ground
a
Terminal 3–
c
Terminals 1–10 and 16–22
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...