5-38
5
3.
Turn the engine start switch to ON, and
then measure the input voltage at the
OCV coupler.
4.
Turn the engine start switch to OFF.
5.
Remove the OCVs.
6.
Measure the OCV resistance.
7.
Connect the battery leads to the OCV
terminals and check the operation of the
spool valve. Replace the OCV if the
spool valve does not operate.
8.
Disconnect the battery leads.
9.
Install the OCVs. See step 4 in “Installing
the cylinder head” (7-68).
10. Remove the intake manifold (STBD).
See “Removing the intake manifold” (6-
17).
11. Remove the fuse holder
1
, and then dis-
connect fuse holder coupler
c
.
12. Remove the engine ECM cover.
13. Remove the engine ECM, and then dis-
connect the engine ECM coupler
d
.
14. Check the wiring harness for continuity.
OCV input voltage:
Red/Yellow (R/Y)–Ground
12.0 V (battery voltage)
OCV resistance (reference data):
6.7–7.7
Ω
at 20 °C (68 °F)
a
PORT
R/Y
b
STBD
R/Y
1
c
d
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...