3-5
RIG
GING
Rigging information
Uncrating procedure
1.
Check the crate for shipping damage.
2.
Remove the top cover.
3.
Remove all of the bolts from the bottom
plate, and then remove the frame.
NOTICE:
Be careful not to damage the
outboard motor.
4.
Remove the wrapping, and then check
the outboard motor for concealed dam-
age.
5.
Remove the top cowling, and then
remove the flywheel magnet cover
1
.
6.
Install a lifting harness
2
to the engine
hangers
3
.
7.
Tension the lifting harness.
8.
Lift up the outboard motor along with the
bottom plate
4
carefully.
NOTICE:
Make
sure that the lifting harness does not
damage any parts of the outboard
motor.
9.
Remove the skeg holder
5
.
10. Remove the bolts
6
.
11. Remove the steering retainer, and then
install a hydraulic steering cylinder fol-
lowing the recommendation of the manu-
facturer.
1
2
2
3
3
4
5
6
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...