7-23
POWR
Power unit
39. Disconnect the oil pressure sensor cou-
pler
R
and water detection switch cou-
pler
T
.
40. Remove the plastic tie
O
, and then
remove the wiring harness from the
holder
P
.
41. Remove the wiring harness.
Installing the wiring harness
To install all of the wiring harness, see “Wir-
ing harness routing” (5-6).
1.
Connect the oil pressure sensor coupler
a
and water detection switch coupler
b
.
2.
Install the wiring harness at the white
tape
c
to the holder
1
, and then fasten
the wiring harness using the plastic tie
2
.
3.
Connect the APS coupler
d
.
4.
Install the holder
e
on the wiring har-
ness to the junction box, and then install
the Rectifier Regulator protector
3
.
5.
Install the cap
4
to the starter motor lead
and brown lead of the wiring harness
5
,
and then connect them together.
6.
Connect the ground lead terminals
f
and
g
.
7.
Fasten the Rectifier Regulator lead and
wiring harness using the plastic ties
6
.
M
L
M
N
L
M
N
p
4
R
T
O
P
b
2
2
1
a
1
c
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...