9-32
9
Removing the clamp bracket
1.
Remove the PTT unit. See “Removing
the PTT unit” (9-37).
2.
Remove the anode
1
.
3.
Remove the ground leads
2
and
3
.
4.
Remove the self-locking nut
4
and
through tube
5
, and then disassemble
the clamp brackets
6
and
7
.
5.
Remove the trim sensor
8
.
6.
Remove the spring
9
, hook
0
, and pins
A
.
7.
Remove the tilt stop levers
B
and
C
,
distance collar assembly
a
, collar
D
,
and bushings
E
.
Checking the clamp bracket anode
1.
Check the anode. Replace if eroded.
Clean if there is grease, oil, or scales.
NOTICE:
Do not apply grease, oil, or
paint to the anode.
Installing the clamp bracket
1.
Assemble the distance collar assembly.
2
1
3
4
5
6
7
8
Distance
a
:
30.3–30.4 mm (1.193–1.197 in)
A
A
9
0
B
C
a
D
E
E
E
a
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...