5-6
5
Wiring harness routing
Port
È
Install the low-pressure fuel pump coupler
onto the wiring harness guide.
É
Fasten the thermoswitch connectors and
wiring harness using the holder.
Ê
Install the engine temperature sensor lead
and thermoswitch lead on the hook of the
wiring harness guide.
Ë
Install the engine temperature sensor cou-
pler onto the wiring harness guide.
Ì
Fasten the wiring harness using the holder
on the fuel rail cover.
Í
Fasten the wiring harness to the fuel rail
using the plastic tie. Make sure that there
is no slack in the wiring harness.
Ë
È
Ì
É
Í
Ê
Ñ
Î
Ï
Ò
Ó
Ô
×
×
Ù
Õ
A
D
D
B
C
A
B
C
D-D
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...