SECTION 6 – OPERATIONAL TEST AND PLACE IN SERVICE
PAGE 6-14 REV. 0 2014-MAY-02
CHECKFIRE 210
Detection and Actuation System
TABLE 6-3: OPERATIONAL TEST (Continued)
Manual Activation Release Circuit Test
– including programmable equipment shutdown
If system is utilizing the equipment shutdown feature through
the internal relay, the following steps confirm the proper oper-
ation of the shutdown. These steps will require operation of
equipment.
Note: If needed, contact appropriate personnel for authoriza-
tion of equipment start up and testing.
1. Start up equipment.
2. Open the protective guard door and push the “PUSH
to Activate / Alarm When Lit” button. Release Activated
starts immediately.
Confirm successful equipment shutdown.
Note: There is no time delay upon manual activation.
3. Release Activated – The Red “PUSH to Activate / Alarm
When Lit” LED, Red Shutdown LED, and sounder are
steady-on for 10 seconds.
4. Post Release Activated – The Red Shutdown LED, and
sounder pulse 1 x 10 seconds.
5. Push the “DELAY/Reset/Silence” button to test sounder
silence. Sounder silences and LEDs continue.
6. Confirm successful release signal (Pass) on RCT.
7. Reset RCT.
8. Reset to Normal: Press and hold “DELAY/Reset/
Silence” button for 3 seconds; Green and Red LEDs are
steady-on for 1 second; then Amber LEDs are steady-on
for 1 second; at end sounder quickly pulses 3 times.
After reset, Power LED remains GREEN steady-on.
RELEASE
ACTIVATED
RED LEDs AND
SOUNDER
REMAIN
STEADY-ON FOR
10 SECONDS
START EQUIPMENT
OPEN DOOR
PUSH RED BUTTON
009343
009290
RETURN TO NORMAL
STATUS
RESET RCT AND
DISPLAY MODULE
POWER LED IS
GREEN STEADY-ON
009290
POST RELEASE
ACTIVATED
CONTINUES UNTIL
MODULE IS RESET
RED LEDs AND
SOUNDER PULSE
1 X 10 SECONDS
CONFIRM RCT
DISPLAYS “PASS”
PUSH BUTTON
SOUNDER STOPS