SECTION 4 – SYSTEM PLANNING
2014-MAY-02 REV. 0 PAGE 4-7
Detection Circuit Cable (Red Connectors) (Continued)
INCORRECT DESIGN INSTALLATIONS
CAUTION
Do not use an EOL Device on a branch line because the
complete detection circuit will not be monitored. (See Figure
4-6 and 4-7). Double branching is not allowed. (See Figures
4-6 thru 4-8). Failure to comply may cause the system to not
function properly.
FIGURE 4-6
INCORRECT EMA AND EOL INSTALLATION
009297
FIGURE 4-7
INCORRECT EMA AND EOL INSTALLATION
009298
CAUTION
Only one EMA may be installed from a detection circuit tee on
a single branch line. If multiple EMAs are to be installed, addi-
tional branch lines on the main trunk will be required (one EMA
per branch line). Incorrect installations will cause the system to
not function properly. See Figure 4-8.
FIGURE 4-8
INCORRECT EMA INSTALLATION
009299
CAUTION
Install EMA(s) as the first component(s) on the Detection Circuit
and on a single use branch line. Failure to comply may cause
the system to not function properly. (See Figure 4-9, and 4-10).
FIGURE 4-9
INCORRECT EMA INSTALLATION
009300
FIGURE 4-10
INCORRECT EMA INSTALLATION
009301
CHECKFIRE 210
Detection and Actuation System
NO EOL DEVICE
ON BRANCH
NO DOUBLE
BRANCHING
EMA MUST BE
ON SINGLE USE
BRANCH
NO EOL DEVICE
ON BRANCH
NO DOUBLE
BRANCHING
EMA MUST BE
ON SINGLE USE
BRANCH
NO DOUBLE
BRANCHING
EMA MUST
BE FIRST
COMPONENT AND
ON SINGLE USE
BRANCH
EMA MUST BE
FIRST COMPONENT