3-10
Emerald ICE Installation, Programming & Maintenance Manual
In
stallation
3
MDF (Main Distribution Frame)
The
various
ports
of
the
Emerald
ICE
are
extended
to
the
MDF
using
industry
standard
4,
12,
and
25
pair
UTP
(Unshielded
Twisted
Pair)
cable.
Inside
the
KSU
pairs
are
terminated
using
screw
terminal
posts,
modular
ended
crimping
connectors
and
AMP
‐
type
Male
gender
connectors.
These
cables
are
then
routed
out
of
the
KSU
to
the
66M1
‐
50
blocks
for
termination
and
jumper
‐
wiring
there.
The
installer
has
choices
when
completing
these
connections
and
it
is
left
to
the
installer’s
discretion
to
use
the
most
suitable
industry
standard
wiring
practice
for
the
particular
installation.
In
the
examples
of
this
manual,
standard
66M1
‐
50
connectors
are
used.
The
following
example
illustrates
a
two
‐
cabinet
installation
with
the
KSUs
mounted
vertically
and
side
by
side.
MDF
cables
are
routed
out
of
the
KSU
through
the
opening
in
the
corner
of
the
KSU
housing.
A
cable
restraint
clamp
is
provided
and
may
be
used
to
secure
cables
at
that
point.
Summary of Contents for EMERALD ICE
Page 1: ...Emerald ICE Digital Key Telephone System TM Installation Maintenance Manual...
Page 3: ......
Page 19: ...xiv Emerald ICE Installation Programming Maintenance Manual TC...
Page 70: ...Emerald ICE Installation Programming Maintenance Manual 3 13 Installation 3...
Page 71: ...3 14 Emerald ICE Installation Programming Maintenance Manual Installation 3...
Page 77: ...3 20 Emerald ICE Installation Programming Maintenance Manual Installation 3...
Page 89: ...4 12 Emerald ICE Installation Programming Maintenance Manual Basic Programming 4...
Page 181: ...6 32 Emerald ICE Installation Programming Maintenance Manual Phone Trunk Programming 02 6...
Page 454: ...Appendix A Door Phone Installation Appendix A Door Phone Installation...
Page 455: ......
Page 464: ...Appendix B Feature Codes Appendix B Feature Codes...
Page 469: ......