
Emerald ICE Installation, Programming & Maintenance Manual
3-1
In
stallation
3
3
Installation
Optimum
system
operation
and
the
best
overall
experience
for
the
users
of
the
Emerald
ICE
telephone
system
is
assured
when
the
following
installation
guidelines
are
followed.
Doing
so
will
streamline
the
process
and
reduce
or
eliminate
the
potential
of
experiencing
problems
while
bringing
the
Emerald
ICE
on
‐
line.
1. Plan
the
installation,
including
the
Key
Service
Unit
(KSU1
&
KSU2)
and
Main
Distribution
Frame
(MDF)
location,
MDF,
Electronic
Key
Telephone
(EKT)
station
locations,
Direct
Station
Selection
(DSS)
console
locations,
station
cable
runs,
and
optional
equipment.
2. Prepare
the
correct
tools
and
supplies.
(UTP
telephony
grade
cable/wiring.
Miscellaneous
telephony
hardware;
66M1
‐
50
blocks,
modular
jacks,
etc.)
3. Run
Emerald
ICE
extension
cable/wiring
for
EKT,
DSS
consoles
and
analog
devices
(FAX
machines,
modems,
etc.)
from
the
MDF
to
each
location.
(Wiring
topology
is
referred
to
as
“star
‐
wiring”
or
“home
‐
run”
configuration;
no
cable
should
loop
from
one
telephone
location
to
another.)
4. Run
cable/wiring
to
any
optional
equipment,
such
as
external
paging
equipment,
loud
bell
signaling
devices,
music
sources,
etc.
5. Mount
the
MDF
backboard
and
attach
the
“punch
‐
down”
(66)
terminal
block(s)
on
the
backboard.
This
documentation
adheres
to
traditional
installation
practices
of
telephony
equipment
using
a
dedicated
MDF
with
66
block
wiring
field
to
promote
full
serviceability
of
the
system
and
connections
using
proven
techniques.
6. Terminate
extension
cables
on
modular
jack
assemblies
at
the
terminal
locations.
7. Mount
the
KSU(S)
on
the
MDF
backboard.
Mounting
template
provided.
8. Ground
KSU1
(and
KSU2
if
equipped)
to
a
known
“good”
earth
ground.
3.1
Installation Outline
Summary of Contents for EMERALD ICE
Page 1: ...Emerald ICE Digital Key Telephone System TM Installation Maintenance Manual...
Page 3: ......
Page 19: ...xiv Emerald ICE Installation Programming Maintenance Manual TC...
Page 70: ...Emerald ICE Installation Programming Maintenance Manual 3 13 Installation 3...
Page 71: ...3 14 Emerald ICE Installation Programming Maintenance Manual Installation 3...
Page 77: ...3 20 Emerald ICE Installation Programming Maintenance Manual Installation 3...
Page 89: ...4 12 Emerald ICE Installation Programming Maintenance Manual Basic Programming 4...
Page 181: ...6 32 Emerald ICE Installation Programming Maintenance Manual Phone Trunk Programming 02 6...
Page 454: ...Appendix A Door Phone Installation Appendix A Door Phone Installation...
Page 455: ......
Page 464: ...Appendix B Feature Codes Appendix B Feature Codes...
Page 469: ......