ENGINE GENERAL INFORMATION AND DIAGNOSIS (M13 ENGINE) 6-2-57
2
MIL Circuit Check
1) Turn ignition switch to OFF position.
2) Remove combination meter referring to “Combination
Meter Removal and Installation” in Section8.
3) Disconnect connectors from ECM.
4) Measure resistance between “PPL/WHT” wire terminal
of combination meter connector and body ground.
Is resistance infinity?
Go to Step 3.
“PPL/WHT” wire cir-
cuit shorted to
ground.
3
MIL Circuit Check
1) Connect connectors to combination meter.
Does MIL turn ON at ignition switch turned ON?
Replace combina-
tion meter.
Substitute a known-
good ECM and
recheck.
Step
Action
Yes
No
Summary of Contents for Wagon R Plus RB310
Page 3: ......
Page 5: ......
Page 57: ...0B 24 MAINTENANCE AND LUBRICATION...
Page 65: ...1B 8 AIR CONDITIONING OPTIONAL...
Page 91: ...3D 16 FRONT SUSPENSION...
Page 141: ...4A 20 FRONT DRIVE SHAFT G10 M13 ENGINES...
Page 153: ...5 6 BRAKES...
Page 163: ...5B 6 FRONT BRAKE...
Page 418: ...ENGINE MECHANICAL M13 ENGINE 6A2 79 Main Bearings Crankshaft and Cylinder Block Components...
Page 435: ...6A2 96 ENGINE MECHANICAL M13 ENGINE...
Page 519: ...6H 4 CHARGING SYSTEM G10 M13 ENGINES...
Page 539: ...7A2 16 MANUAL TRANSAXLE M13 ENGINE Transaxle Case Components...
Page 553: ...7A2 30 MANUAL TRANSAXLE M13 ENGINE Input Counter Shaft Components...
Page 576: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 7 Table of Component Operation...
Page 690: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 121...
Page 789: ...7C 14 CLUTCH G10 M13 ENGINES...
Page 797: ...7D 8 TRANSFER...
Page 821: ...8B 4 LIGHTING SYSTEM...
Page 827: ...8C 6 INSTRUMENTATION DRIVER INFORMATION...
Page 839: ...8G 12 IMMOBILIZER CONTROL SYSTEM G10 M13 ENGINES...
Page 845: ...9 6 BODY SERVICE...
Page 846: ...Prepared by 1st Ed August 2003 Printed in Japan 844...