6A2-12 ENGINE MECHANICAL (M13 ENGINE)
6) After warming up, raise engine speed to 4,000 rpm and mea-
sure oil pressure.
Oil pressure specification
More than 270 kPa (2.7 kg/cm
2
, 39.8 psi)
at 4,000 rpm
7) Stop engine and remove oil pressure gauge and attachment.
8) Before reinstalling oil pressure switch (2), be sure to wrap its
screw threads with sealing tape (1) and tighten switch to
specified torque.
Tightening torque
Oil pressure switch (a): 14 N·m (1.4 kg-m, 10.5 lb-ft)
9) Start engine and check oil pressure switch (2) for oil leakage.
If oil leakage is found, repair it.
10) Connect oil pressure switch coupler and fit cover (1) firmly.
NOTE:
If sealing tape edge is bulged out from screw threads of
switch, cut it off.
Summary of Contents for Wagon R Plus RB310
Page 3: ......
Page 5: ......
Page 57: ...0B 24 MAINTENANCE AND LUBRICATION...
Page 65: ...1B 8 AIR CONDITIONING OPTIONAL...
Page 91: ...3D 16 FRONT SUSPENSION...
Page 141: ...4A 20 FRONT DRIVE SHAFT G10 M13 ENGINES...
Page 153: ...5 6 BRAKES...
Page 163: ...5B 6 FRONT BRAKE...
Page 418: ...ENGINE MECHANICAL M13 ENGINE 6A2 79 Main Bearings Crankshaft and Cylinder Block Components...
Page 435: ...6A2 96 ENGINE MECHANICAL M13 ENGINE...
Page 519: ...6H 4 CHARGING SYSTEM G10 M13 ENGINES...
Page 539: ...7A2 16 MANUAL TRANSAXLE M13 ENGINE Transaxle Case Components...
Page 553: ...7A2 30 MANUAL TRANSAXLE M13 ENGINE Input Counter Shaft Components...
Page 576: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 7 Table of Component Operation...
Page 690: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 121...
Page 789: ...7C 14 CLUTCH G10 M13 ENGINES...
Page 797: ...7D 8 TRANSFER...
Page 821: ...8B 4 LIGHTING SYSTEM...
Page 827: ...8C 6 INSTRUMENTATION DRIVER INFORMATION...
Page 839: ...8G 12 IMMOBILIZER CONTROL SYSTEM G10 M13 ENGINES...
Page 845: ...9 6 BODY SERVICE...
Page 846: ...Prepared by 1st Ed August 2003 Printed in Japan 844...