Installation
Install removed parts in reverse order of removal, noting the fol-
lowing points.
1) Install wheel bearing spacer (1) with the tapered side of its
inner diameter directed toward outside, or brake drum side.
2) Press in a new bearing (2) and retainer ring (3) in order by
using an hydraulic press (4).
3) Inspect axle shaft length.
Rear axle shaft length “a”
Right side: 657.5 mm (25.9 in.)
Left side: 785.5 mm (30.9 in.)
4) Apply grease to axle shaft oil seal (1) lip as shown.
“A”: Grease 99000-25010
5) Apply sealant to mating surface (2) of axle housing and
brake back plate.
“B”: Sealant 99000-31090
NOTE:
Use care not to cause any damage to outside of retainer
ring.
A : Tapered side
B : Blank
C : Differential side
D : Without ABS
E : With ABS
NOTE:
Make sure to remove old sealant before applying it anew.
Summary of Contents for Wagon R Plus RB310
Page 3: ......
Page 5: ......
Page 57: ...0B 24 MAINTENANCE AND LUBRICATION...
Page 65: ...1B 8 AIR CONDITIONING OPTIONAL...
Page 91: ...3D 16 FRONT SUSPENSION...
Page 141: ...4A 20 FRONT DRIVE SHAFT G10 M13 ENGINES...
Page 153: ...5 6 BRAKES...
Page 163: ...5B 6 FRONT BRAKE...
Page 418: ...ENGINE MECHANICAL M13 ENGINE 6A2 79 Main Bearings Crankshaft and Cylinder Block Components...
Page 435: ...6A2 96 ENGINE MECHANICAL M13 ENGINE...
Page 519: ...6H 4 CHARGING SYSTEM G10 M13 ENGINES...
Page 539: ...7A2 16 MANUAL TRANSAXLE M13 ENGINE Transaxle Case Components...
Page 553: ...7A2 30 MANUAL TRANSAXLE M13 ENGINE Input Counter Shaft Components...
Page 576: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 7 Table of Component Operation...
Page 690: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 121...
Page 789: ...7C 14 CLUTCH G10 M13 ENGINES...
Page 797: ...7D 8 TRANSFER...
Page 821: ...8B 4 LIGHTING SYSTEM...
Page 827: ...8C 6 INSTRUMENTATION DRIVER INFORMATION...
Page 839: ...8G 12 IMMOBILIZER CONTROL SYSTEM G10 M13 ENGINES...
Page 845: ...9 6 BODY SERVICE...
Page 846: ...Prepared by 1st Ed August 2003 Printed in Japan 844...