6E2-36 ENGINE AND EMISSION CONTROL SYSTEM (M13 ENGINE)
Vehicle speed sensor (VSS) and its circuit inspection
1) Confirm that terminal voltage and ground circuit continuity at
VSS connector terminals are in good condition referring to
Step 3 to 5 of “DTC P0500 Diag. Flow” in Section 6-2.
If not, repair VSS circuit.
2) Check that VSS signal voltage varies from low to high or
from high to low as specified voltage referring to Step 9 of
“DTC P0500 Diag. Flow” in Section 6-2.
If signal voltage varies as specified, VSS is in good condi-
tion.
If not, replace VSS.
Vehicle speed sensor (VSS) removal and installation
Refer to “Vehicle Speed Sensor (VSS) Removal and Installation”
in Section 7A2.
Knock sensor removal and installation
Removal
1) Disconnect negative cable from battery.
2) Hoist vehicle.
3) Disconnect knock sensor connector (1).
4) Remove knock sensor (2) from cylinder block.
Installation
Reverse removal procedure for installation.
Tightening torque
Knock sensor (a): 22 N·m (2.2 kg-m, 16.0 lb-ft)
1
2, (a)
Summary of Contents for Wagon R Plus RB310
Page 3: ......
Page 5: ......
Page 57: ...0B 24 MAINTENANCE AND LUBRICATION...
Page 65: ...1B 8 AIR CONDITIONING OPTIONAL...
Page 91: ...3D 16 FRONT SUSPENSION...
Page 141: ...4A 20 FRONT DRIVE SHAFT G10 M13 ENGINES...
Page 153: ...5 6 BRAKES...
Page 163: ...5B 6 FRONT BRAKE...
Page 418: ...ENGINE MECHANICAL M13 ENGINE 6A2 79 Main Bearings Crankshaft and Cylinder Block Components...
Page 435: ...6A2 96 ENGINE MECHANICAL M13 ENGINE...
Page 519: ...6H 4 CHARGING SYSTEM G10 M13 ENGINES...
Page 539: ...7A2 16 MANUAL TRANSAXLE M13 ENGINE Transaxle Case Components...
Page 553: ...7A2 30 MANUAL TRANSAXLE M13 ENGINE Input Counter Shaft Components...
Page 576: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 7 Table of Component Operation...
Page 690: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 121...
Page 789: ...7C 14 CLUTCH G10 M13 ENGINES...
Page 797: ...7D 8 TRANSFER...
Page 821: ...8B 4 LIGHTING SYSTEM...
Page 827: ...8C 6 INSTRUMENTATION DRIVER INFORMATION...
Page 839: ...8G 12 IMMOBILIZER CONTROL SYSTEM G10 M13 ENGINES...
Page 845: ...9 6 BODY SERVICE...
Page 846: ...Prepared by 1st Ed August 2003 Printed in Japan 844...