ENGINE GENERAL INFORMATION AND DIAGNOSIS (M13 ENGINE) 6-2-113
DTC Confirmation Procedure
1) With ignition switch turned OFF, connect scan tool.
2) Turn ON ignition switch and clear DTC using scan tool.
3) Crank engine for 3 – 5 sec.
4) Check DTC and pending DTC.
Troubleshooting
Step
Action
Yes
No
1
Was “Engine and Emission Control System
Check” performed?
Go to Step 2.
Go to “Engine and
Emission Control Sys-
tem Check” in this sec-
tion.
2
Check CKP sensor and connector for proper
installation.
Is CKP sensor installed properly and connector
connected securely?
Go to Step 3.
Correct.
3
Check Wire Harness and Connection.
1) Disconnect connector from CKP sensor.
2) Check for proper connection to CKP sensor at
“BLK/RED”, “PNK” and “BLK” wire terminals.
3) If OK, turn ignition switch ON and check for
voltage at “BLK/RED”, “PNK” and “BLK” wire
terminals of disconnected CKP sensor con-
nector. See fig. 1.
Terminal “B+”: 10 – 14 V
Terminal “Vout”: 4 – 5 V
Terminal “GRD”: 0 V
Is check result satisfactory?
Go to Step 5.
Go to Step 4.
4
Was terminal “Vout” voltage in Step 3 out of speci-
fication?
“PNK” wire open, short or
poor connection.
If wire and connection are
OK, substitute a known-
good ECM and recheck.
“BLK/RED” and “BLK”
wire open, short or
poor connection.
5
Check Ground Circuit.
1) Turn ignition switch to OFF position.
2) Measure resistance between “BLK” wire termi-
nal of CKP sensor connector and engine
ground.
Is resistance below 5
Ω
?
Go to Step 6.
“BLK” wire open or
high resistance.
6
Check Engine Start Signal.
1) Check voltage between “E22-35” wire terminal
of ECM connector and engine ground with
engine cranking.
Does it voltage more than 6 V?
Go to Step 7.
“BLK/YEL” wire circuit
open, high resistance
or shorted to ground.
If wire are OK, check
starting motor refer-
ring to “Performance
Test” in Section 6G.
Summary of Contents for Wagon R Plus RB310
Page 3: ......
Page 5: ......
Page 57: ...0B 24 MAINTENANCE AND LUBRICATION...
Page 65: ...1B 8 AIR CONDITIONING OPTIONAL...
Page 91: ...3D 16 FRONT SUSPENSION...
Page 141: ...4A 20 FRONT DRIVE SHAFT G10 M13 ENGINES...
Page 153: ...5 6 BRAKES...
Page 163: ...5B 6 FRONT BRAKE...
Page 418: ...ENGINE MECHANICAL M13 ENGINE 6A2 79 Main Bearings Crankshaft and Cylinder Block Components...
Page 435: ...6A2 96 ENGINE MECHANICAL M13 ENGINE...
Page 519: ...6H 4 CHARGING SYSTEM G10 M13 ENGINES...
Page 539: ...7A2 16 MANUAL TRANSAXLE M13 ENGINE Transaxle Case Components...
Page 553: ...7A2 30 MANUAL TRANSAXLE M13 ENGINE Input Counter Shaft Components...
Page 576: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 7 Table of Component Operation...
Page 690: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 121...
Page 789: ...7C 14 CLUTCH G10 M13 ENGINES...
Page 797: ...7D 8 TRANSFER...
Page 821: ...8B 4 LIGHTING SYSTEM...
Page 827: ...8C 6 INSTRUMENTATION DRIVER INFORMATION...
Page 839: ...8G 12 IMMOBILIZER CONTROL SYSTEM G10 M13 ENGINES...
Page 845: ...9 6 BODY SERVICE...
Page 846: ...Prepared by 1st Ed August 2003 Printed in Japan 844...