7) Install brake back plates (1) and tighten back plate bolts (2)
to specified torque.
Tightening torque
Brake back plate bolt (a): 23 N
·
m (2.3kg-m, 16.5 lb-ft)
8) Connect wheel speed sensor and lead wire clamps (right &
left) (if equipped).
9) Connect brake pipes to wheel cylinders (1) (right & left) and
tighten brake pipe flare nuts (2) to specified torque.
Tightening torque
Brake pipe flare nut (b): 16 N
·
m (1.6 kg-m, 11.5 lb-ft)
10) Connect brake flexible hoses (1) (right & left) to bracket on
rear axle and secure it with E-rings (2) (right & left).
11) Install LSPV spring (1) to rear axle (2) (if equipped with
LSPV).
Tightening torque
LSPV bolt (a): 26 N
·
m (2.6 kg-m, 19.0 lb-ft)
CAUTION:
Since there are two holes on each side of rear axle, be
sure to install wheel speed sensor at the position as
shown in the figure.
Summary of Contents for Wagon R Plus RB310
Page 3: ......
Page 5: ......
Page 57: ...0B 24 MAINTENANCE AND LUBRICATION...
Page 65: ...1B 8 AIR CONDITIONING OPTIONAL...
Page 91: ...3D 16 FRONT SUSPENSION...
Page 141: ...4A 20 FRONT DRIVE SHAFT G10 M13 ENGINES...
Page 153: ...5 6 BRAKES...
Page 163: ...5B 6 FRONT BRAKE...
Page 418: ...ENGINE MECHANICAL M13 ENGINE 6A2 79 Main Bearings Crankshaft and Cylinder Block Components...
Page 435: ...6A2 96 ENGINE MECHANICAL M13 ENGINE...
Page 519: ...6H 4 CHARGING SYSTEM G10 M13 ENGINES...
Page 539: ...7A2 16 MANUAL TRANSAXLE M13 ENGINE Transaxle Case Components...
Page 553: ...7A2 30 MANUAL TRANSAXLE M13 ENGINE Input Counter Shaft Components...
Page 576: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 7 Table of Component Operation...
Page 690: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 121...
Page 789: ...7C 14 CLUTCH G10 M13 ENGINES...
Page 797: ...7D 8 TRANSFER...
Page 821: ...8B 4 LIGHTING SYSTEM...
Page 827: ...8C 6 INSTRUMENTATION DRIVER INFORMATION...
Page 839: ...8G 12 IMMOBILIZER CONTROL SYSTEM G10 M13 ENGINES...
Page 845: ...9 6 BODY SERVICE...
Page 846: ...Prepared by 1st Ed August 2003 Printed in Japan 844...