16 · GuardOne
®
· Manual
4
Assembly
NOTICE!
Property damage due to incorrect installation!
- The installation must only be carried out by experienced staff.
NOTICE!
Property damage at the pre-filter due to obstruction!
An obstructed pre-filter will have a negative impact on air filtration efficiency and can cause blocked filter alarms.
- Make sure that the pre-filter is not obstructed in any way at any time.
Choosing an installation site
Before starting the assembly, make sure that the requirements at the installation site specified below are met.
›
The GuardOne® Workstation must be placed on a firm and level work surface.
›
A safe standing of the GuardOne® Workstation must be ensured.
›
The surface of the installation site has, at minimum, the same dimensions as the GuardOne® Workstation itself.
›
A minimum distance of 10 cm to adjacent objects and walls must be kept to both sides and the back of the GuardOne® Workstation.
›
The GuardOne® Workstation must be easily accessible from all sides. Especially at the back of the GuardOne® Workstation, there
must be enough space to operate the main power switch on the right rear side of the top housing.
›
Above the GuardOne® Workstation, there must be a minimum of at least 25 cm free space to ensure free and unimpaired airflow.
›
The laboratory or workroom must be of sufficient size to provide ample space around the GuardOne® Workstation.
›
Adequate lighting must be available.
›
Adequate ventilation must be available.
›
A connection option to the power supply must be available.
›
Escape routes and rescue equipment are freely accessible.
›
All local safety requirements are fulfilled.
›
The installation site is dry and frost-free.
- A minimum relative humidity of 40% is guaranteed.
- A minimum room temperature of + 15 °C and a maximum room temperature of + 40 °C is guaranteed.
›
The GuardOne® Workstation is not exposed to direct sunlight.
›
The GuardOne® Workstation must be set up in a place that can easily be kept clean and dust free.
Preparing the installation
›
The GuardOne® Workstation is delivered only partly assembled to reduce transport volume by almost 50%.
›
The final assembly can be performed directly at the chosen installation site.
›
The assembly will take no longer than 15 minutes and does not require any special knowledge or any kind of tools.
›
Components of the GuardOne® Workstation are heavy. It is recommended to have a second person available for assistance.
Watch our video to GuardOne
®
:
https://www.starlab.click/guardone-assembling
In case of doubt, contact your local Starlab
service or sales contact for assistance.
Summary of Contents for GuardOne
Page 54: ...54 GuardOne Bedienungsanleitung...
Page 106: ...106 GuardOne Manuel...
Page 158: ...158 GuardOne Manuale...
Page 210: ...210 GuardOne Manual...
Page 211: ...GuardOne Manual 211 Notes...