419
Solar-Log™ PRO
Cable connection via S0 (IN):
Solar-Log™ S
0
terminal block
Solar-Log™ PRO380-CT
Pin assignment
Pin assignment
1 - S0+
18 - S0+
2 - S0-
19 - S0-
3
4
Place a cable bridge between pin 3 and 4 on the Solar-Log™.
Possible meter operating modes for the Solar-Log™ PRO380 CT via SO connection (IN):
•
Total plant meter
•
Sub-consumption meter
•
Consumption meter
•
Generator
Meter‘s impulse factor:
10000 p / kWh
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...