172
Ingeteam
Procedure
1. Open the inverter as shown in the inverter‘s instructions.
2. Connect terminals „Pin 1-RS485-A (+)“, „Pin 6-GND“ and „Pin 2-RS485-B (-)“ of inverter 1 to the corresponding
terminals on inverter 2.
3. Connect the other inverters to each other in the same way.
4. Terminate the last inverter.
Insert jumper into the RS485 card.
5. Close inverters.
Allocate communication address
•
Recommendation: Continuous numbering starting with 1.
•
Setting: Using the inverter operating display.
•
Procedure: Start according to the inverter‘s instructions.
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...