Procedure
1. Open the inverter as shown in the inverter's instructions.
2. If you are making the cable yourself, connect the wires as shown in the following diagram:
Terminal strip inside the inverter
Terminal strip inside the inverter
RS485 terminal
RS485 terminal
►
1 T/R 1+
►
1 T/R 2+
►
2 T/R 1-
►
2 T/R 2-
3. Connect terminals A and B on inverter 1 to the corresponding terminals on inverter 2.
4. Connect the other inverters to each other in the same way.
5. Terminate the last inverter.
Set the DIP switch for the terminal resistor to ON.
6. Close inverters.
7. Insert the terminal block connector into the Solar-Log™ RS485 socket.
Allocate communication address
•
Recommendation: Continuous numbering starting with 1.
•
Setting: Using the inverter DIP switch
•
Procedure: Start according to the inverter's instructions
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...