63 03 452 D3352
D3352
.
031.05.08
.
02 10.2015
55
Sirona Dental Systems GmbH
5 Installation: X-ray unit
Installation Manual ORTHOPHOS XG 3D / Ceph
5.4 Installing the floor stand (option 2)
båÖäáëÜ
Attaching to the wall and floor
1. Mount the upper wall holder.
2. Slide the unit with the assembled floor stand up to the wall.
3. Attach the unit
loosely
to the upper wall holder:
Place the screws (U) in the grooves.
Screw the unit onto the wall holder
loosely
using nuts and washers
(V).
NOTICE! Do not tighten the screws firmly.
4. Level the unit again in both directions with the help of the spirit level
and tighten the screws on the wall holder firmly.
5. Drill the fastening holes in the floor through the holes in the base
plate. Remove the drilling dust with a vacuum cleaner.
6. Slide the wall plugs (W) through the base plate and into the drillings.
7. Use the five screws and washers (X) to screw the base plate to the
floor.
IMPORTANT
Use the long wall holder for the floor stand installation [ → 39].
410 mm
16 1/2“
1980 mm
78“
Ø 10mm
Ø 3/8”
IMPORTANT
Observe the required movement range of the unit during installation.
2x M8
2x
8,4
Ø
2x M8x30
V
U
X
W
Summary of Contents for Orthophos XG 3D/Ceph
Page 1: ...k W f j NMKOMNR loqelmelp ud Pa L b b Cover page...
Page 2: ......