5 Installation: X-ray unit
Sirona Dental Systems GmbH
5.2 Tools, materials, and measurement tools you will need
Installation Manual ORTHOPHOS XG 3D / Ceph
Additional requirements for installation with floor stand:
Masonry drill bit 12mm
● Masonry drill bit 12mm (1/2")
Graphics: Neutral Allen wrench
Hexagon socket 2 mm
● Allen key 2 mm
Socket wrench
Socket wrench and extension 17
● Socket wrench and extension
Wrench insert 17
5.2.2
Measurement tools
● Multimeter or ammeter (battery-operated)
● Test unit for measuring the leakage current of the unit:
Automatic tester in accordance with IEC 62353
For measurements, Sirona recommends an automatic tester (example
illustration) which complies with standard IEC 62353. If you do not use an
automatic tester, please pay attention to the specifications in the standard
IEC 62353.
● Current source for protective conductor test
Technical data:
– No-load voltage min. 4 V - max. 24 V
– Short-circuit current min. 0.2 A
Ø 12mm