8.10
Processing an external demand
The controller can process binary or analog demands for an externally required signal by a
more complex secondary system.
NOTICE
Overheating may occur in the heating circuits of the primary controller without control valve.
Excessive charging temperatures in DHW circuits without control valve controlled by the pri-
mary controller are excluded when the default settings of the controller are used: while storage
tank charging is active, no flow temperature higher than the charging temperature is used by
the primary controller. Nevertheless, if the
Priority for external demand
function is activated,
the external demand is also processed during storage tank charging.
Functions
WE
Configuration
Priority for external demand
OFF
DHW–CO4–17 = ON
8.10.1 Processing an external demand with a binary signal
Regardless of the operating mode for control loop 1, except for manual mode, the flow temper-
ature entered in 'Min. flow set point in heating circuit with active binary demand' is used in con-
trol circuit HC1 when the binary input is either a make contact (Demand switching state active =
1) or a break contact (Demand switching state active = 0).
Note:
The connection of the binary input with the setting HC1–CO1–17 = ON depends on the
system selected. Refer to the fold-out page.
Functions
WE
Configuration
Binary demand processing
OFF
1
HC1–CO1–17 = ON
Demand switching state active / 0, 1
Parameter
WE
Parameter settings
Min. flow set point in heating circuit with active
binary demand
40.0 °C
HC1–PA1–10 / 5.0 to 50.0 °C
86
EB 5610 EN
System-wide functions
Summary of Contents for trovis 5600
Page 22: ...22 EB 5610 EN Setup settings B C D A A...
Page 124: ...124 EB 5610 EN...
Page 125: ...EB 5610 EN 125...
Page 126: ...126 EB 5610 EN Key number 1732...