
1041897, R
EV
. 00
P
AGE
20 - E
NHANCED
M600/605; E
NHANCED
M10600/M10605 R
EPAIR
& R
EPLACEMENT
M
ILLENNIUM
S
ERVICE
& T
ECHNICAL
I
NFORMATION
F
RONT
C
ABINET
R
EPLACEMENT
To remove the Front Cabinet
1. Remove the Rear Cabinet. Refer to the Rear Cabinet Replacement Section.
2. Slide the Front Cabinet forward until it is clear from the Base Cabinet.
3. Remove the Flow Meter. Refer to the Flow Meter Replacement Section.
4. Remove the DISS outlet fitting. Refer to the DISS Outlet Fitting Replacement Section.
5. Remove the Hour Meter. Refer to the Hour Meter Replacement Section.
6. Remove the battery wiring harness. Refer to the Main PCB to Battery Wiring Replacement Sec-
tion.
7. Remove the Power Switch. Refer to the Power Switch Replacement Section.
8. Remove the OPI Wiring Harness. Refer to the OPI Wiring Harness Replacement (Model 605
Only) Section.
9. Remove the Main PCB. Refer to the Main PCB Replacement Section.
10. Remove the OPI board. Refer to the OPI PCB Replacement (Model 605 Only) Section.
To install the Front Cabinet
1. Position the Front Cabinet face down on a protected work surface that will not damage the Front
Cabinet.
2. Install the OPI Board. Refer to the OPI PCB Replacement (Model 605 Only) Section.
3. Install the Main PCB. Refer to the Main PCB Replacement Section.
4. Install the OPI Wiring Harness. Refer to the OPI Wiring Harness Replacement (Model 605 Only)
Section.
5. Install the Hour Meter. Refer to the Hour Meter Replacement Section.
6. Install the Power Switch. Refer to the Power Switch Replacement Section.
7. Install the Main PCB to Battery Wiring Harness. Refer to the Main PCB to Battery Wiring
Replacement Section.
8. Install the Power Switch harness. Refer to the Main PCB to Power Switch Wiring Replacement
Section.
9. Install the DISS outlet fitting. Refer to the DISS Outlet Fitting Replacement Section.
10. Install the Flow Meter. Refer to the Flow Meter Replacement Section.
11. Slide the Front Cabinet onto the Base Cabinet.