
M600/M605 R
EPAIR
& R
EPLACEMENT
- P
AGE
23
1041896, R
EV
. 00
M
ILLENNIUM
S
ERVICE
& T
ECHNICAL
I
NFORMATION
F
RONT
C
ABINET
R
EPLACEMENT
To remove the Front Cabinet
1. Remove the Rear Cabinet. Refer to the Rear Cabinet Replacement Section.
2. Slide the Front Cabinet forward until it is clear from the Base Cabinet.
3. Remove the Flow Meter. Refer to the Flow Meter Replacement Section.
4. Remove the DISS outlet fitting. Refer to the DISS Outlet Fitting Replacement Section.
5. Remove the Power Switch harness. Refer to the Power Switch Wiring Harness Replacement Sec-
tion.
6. Remove the O
2
/solenoid/battery wiring harness. Refer to the O2/Solenoid/Battery Wiring Harness
Section.
7. Remove the Power Switch. Refer to the Power Switch Replacement Section.
8. Remove the OPI Wiring Harness. Refer to the OPI Wiring Harness Replacement (Model M605
Only) Section.
9. Remove the Main PCB. Refer to the Main PCB Replacement Section.
10. Remove the OPI board. Refer to the OPI Board Replacement (Model M605 Only) Section.
To install the Front Cabinet
1. Remove the protective backing from the control Overlay. Carefully aligning the Overlay apply it to
the Front Cabinet.
2. Position the Front Cabinet face down on a protected work surface that will not damage the Front
Cabinet.
3. Install the OPI Board. Refer to the OPI Board Replacement (Model M605 Only) Section.
4. Install the Main PCB. Refer to the Main PCB Replacement Section.
5. Install the OPI Wiring Harness. Refer to the OPI Wiring Harness Replacement (Model M605 Only)
Section.
6. Install the Power Switch. Refer to the Power Switch Replacement Section.
7. Install the O
2
/solenoid/battery wiring harness. Refer to the O2/Solenoid/Battery Wiring Harness
Section.
8. Install the Power Switch harness. Refer to the Power Switch Wiring Harness Replacement Sec-
tion.
9. Install the DISS outlet fitting. Refer to the DISS Outlet Fitting Replacement Section.
10. Install the Flow Meter. Refer to the Flow Meter Replacement Section.
11. Slide the Front Cabinet onto the Base Cabinet.