
1041898, R
EV
. 01
P
AGE
24 - M10600/M10605 R
EPAIR
& R
EPLACEMENT
M
ILLENNIUM
S
ERVICE
& T
ECHNICAL
I
NFORMATION
6. Remove the O
2
/solenoid/battery wiring harness connector from the J1 location on the OPI Board.
F
IGURE
Y: P
OWER
S
WITCH
AND
(J1) L
OCATION
7. Remove the screws that secure the screw down cable ties to the Front Cabinet.
8. Either feed the O
2
/solenoid/battery wiring harness through the screw down cable ties or, if new
screw down cable ties are available, cut the cable ties and remove the O
2
/solenoid/battery wiring
harness.
9. Note the location at which the battery wires exit the large convoluted tubing. Cut the cable ties and
remove the O
2
/solenoid/battery wiring harness from the convoluted tubing.
To install the O
2
/Solenoid/Battery Wiring Harness
1. Install the O
2
/solenoid/battery wiring harness into the large convoluted tubing. Ensure that the
battery wires exit the large convoluted tubing at their original location. Secure the convoluted tub-
ing with four cable ties.
2. Either feed the O
2
/solenoid/battery wiring harness through the original screw down cable ties, or if
new screw down cable ties are available, loosely install four cable ties grouping the O
2
/solenoid/
battery wiring harness, Power Switch wiring harness, along with the clear and yellow pressure tub-
ing together.
3. Install the O
2
/solenoid/battery wiring harness connector onto the J1 location on the OPI board.
4. Install the two red wires from the O
2
/solenoid/battery wiring harness to the Power Switch.
5. Position the screw down cable ties at their mounting posts then secure each using the original
screws. Tighten the screw down cable ties.
6. Install the two connectors from the O
2
/solenoid/battery wiring harness on the Valve/Solenoid
Assembly.
7. Install the battery connector on the battery.