![PFU Limited fi-6130 Maintenance Manual Download Page 141](http://html1.mh-extra.com/html/pfu-limited/fi-6130/fi-6130_maintenance-manual_1535731141.webp)
08
July 27, 09 K.Okada
A.Miyoshi I.Fujioka
Refer to Revision Record on page 2.
TITLE
fi-6140/fi-6240/fi-6130/fi-6230/fi-614PR
Maintenance Manual
07
Nov.12, 08 K.Okada
T.Anzai
I.Fujioka
Refer to Revision Record on page 2.
CUST.
06
Mar.10, 08 K.Okada
T.Anzai
I.Fujioka
Refer to Revision Record on page 2.
DRAW
No.
P1PA03540-B0XX/6
Rev. DATE DESIGN CHECK APPR. DESCRIPTION
Design
July 27, 2007
K.Okada
CHECK
K.Okada
APPR.
T.Anzai
PFU LIMITED
Page
141
/
257
Section 5-12-4
(4) Lifting up the FB Motor side of the OPT Box Unit 1, move the OPT Box Unit outward 2 , and then remove the CR shaft 3.
4. Remove OPT Unit.
(5) Referring to step (4) of Section 5-12-5 “OPT Unit,” remove the OPT Unit.
5. Remove Joint PCA.
(6) Referring to Step (4) of Section 5-12-10 “Joint PCA,” remove the Joint PCA.
6. Remove the core and Inverter cable.
(7) Remove the core and Inverter cable.
Core
Inverter cable
1
2
FB Motor
CR Shaft
3
CR Shaft
2