
Operating and Maintenance Instructions - Chiller - Series EB 210 - EB 440
© Pfannenberg GmbH
Page 80 / 293
EN
5.3 Set up the chiller
Chillers are designed for indoor installation only (not outdoor).
For proper operation of the unit the following points must be observed.
Place the chiller in an area shielded from any possible manufacturing residuals (shavings, dust, etc.) and well-
ventilated, away from heat sources and direct influence of sun light.
Chillers should be placed in an area without chemical and corrosive substances, flammable gas, hot air and liquid
coming from nearby processes.
Position the unit as close as possible to the user system, to avoid pressure losses along the hydraulic connection
pipes.
Use the adjustable feet (where installed) to level off the unit.
Provide enough space for access and air circulation, see chapter
Technical data
.
The chiller can optionally be equipped with a polypropylene air filter which is designed for dry dust. In case of an oil
mist environment a special washable aluminum filter is required.
CAUTION
Malfunction due to unspecified environmental conditions
Standard units are designed for indoor use only. They are not able to handle any conditions such like low
temperatures, high humidity
or sun light which are covered under the term “outdoor”. For a standard unit the
outdoor installation is absolutely forbidden, even if under a roof.
Only special designed outdoor units can be used in outdoor installation.
For regular maintenance or adjustment, the chiller shall be located between 0.3 m and 1.0 m above the
servicing level.
5.4 Connect the chiller to the hydraulic pipes
For proper operation of the unit the following minimum requirements for the hydraulic circuit must be observed.
The chiller has been cleaned by means of specific cleaning products. Make sure that the pipes used do not contain
dirt or processing residues; if in doubt, perform one or more cleaning cycles.
▪
Install a filter on the chiller inlet return pipe, with metal mesh of
100 μm.
▪
Flush the system with FUCHS “Maintain professional washer LI” (Pfannenberg part number:
46783000135
– 25 kg Tank) at least for 10 minutes.
Dilution percentage:
2 % Professional Washer
98 % Water
(it is recommended to use demineralized water)
▪
Clean the filer if necessary and remove it after finishing the cleaning procedure.
Use pipes with same diameter of the circuit connections (connection size see chapter
Technical data
).
NOTICE
Malfunction due to incorrect hydraulic connection
For the hydraulic connection please refer to the chapter
Technical data
or the enclosed
hydraulic diagram
.
The flow rate and the fluid circulation direction must be respected during connection in accordance with INLET-
OUTLET identification plates.
Recommendation for a proper function
It is recommended to install one shut-off valve at each connection inlet and outlet to isolate the chiller from the
system.
It is recommended to install a filter on the chiller inlet return pipe, with metal mesh of 100 μm.
It is recommended to insulate the pipes to prevent condensation.
If user’s circuit is at least 500 mm over the hydraulic connection of the chiller, the fluid in the piping may drain
back and overflow the chiller reservoir if the chiller is shut down. This can be prevented by using a check
valve in the supply line, and either a solenoid valve on the return line.
Summary of Contents for EB 210
Page 97: ...DE Betriebs Wartungsanleitung Chiller Serie EB 210 EB 440 Version 1 0 Juni 2019...
Page 196: ...ES Manual de uso y mantenimiento Refrigerador Serie EB 210 EB 440 Versi n 1 0 Junio 2019...
Page 244: ...RU EB 210 EB 440 1 0 2019...
Page 245: ...Pfannenberg Pfannenberg Pfannenberg...
Page 248: ...EB 210 EB 440 Pfannenberg GmbH Page 248 293 RU 1 1 1 1 2 1 3 c...
Page 249: ...EB 210 EB 440 Pfannenberg GmbH Page 249 293 RU 1 4...
Page 251: ...EB 210 EB 440 Pfannenberg GmbH Page 251 293 RU 2 1...
Page 252: ...EB 210 EB 440 Pfannenberg GmbH Page 252 293 RU 2 2 2 2 1 2 3 2006 42 CE...
Page 253: ...EB 210 EB 440 Pfannenberg GmbH Page 253 293 RU 2014 68 UE I...
Page 254: ...EB 210 EB 440 Pfannenberg GmbH Page 254 293 RU 3 Pfannenberg 3 1 3 2 1 2 3 4 5 6 1 2 2 3 4 5...
Page 255: ...EB 210 EB 440 Pfannenberg GmbH Page 255 293 RU 3 3 3 3 1 3 3 2...
Page 256: ...EB 210 EB 440 Pfannenberg GmbH Page 256 293 RU 3 3 3 3 3 4 3 3 5 3 3 6...
Page 257: ...EB 210 EB 440 Pfannenberg GmbH Page 257 293 RU 3 4...
Page 259: ...EB 210 EB 440 Pfannenberg GmbH Page 259 293 RU...
Page 263: ...EB 210 EB 440 Pfannenberg GmbH Page 263 293 RU 4 4 3...
Page 264: ...EB 210 EB 440 Pfannenberg GmbH Page 264 293 RU 4 5 4 5 1 EB 210 4 5 2 EB 260...
Page 265: ...EB 210 EB 440 Pfannenberg GmbH Page 265 293 RU 4 5 3 EB 310 4 5 4 EB 360...
Page 266: ...EB 210 EB 440 Pfannenberg GmbH Page 266 293 RU 4 5 5 EB 410 4 5 6 EB 440...
Page 268: ...EB 210 EB 440 Pfannenberg GmbH Page 268 293 RU 4 7 4 7 1 EB 210 260...
Page 269: ...EB 210 EB 440 Pfannenberg GmbH Page 269 293 RU 4 7 2 EB 310 440...
Page 272: ...EB 210 EB 440 Pfannenberg GmbH Page 272 293 RU 5 5 1 5 2...
Page 274: ...EB 210 EB 440 Pfannenberg GmbH Page 274 293 RU 33 7 5 mm S355JR 1 0045 5 3...
Page 279: ...EB 210 EB 440 Pfannenberg GmbH Page 279 293 RU 6 30...
Page 280: ...EB 210 EB 440 Pfannenberg GmbH Page 280 293 RU Harting...
Page 282: ...EB 210 EB 440 Pfannenberg GmbH Page 282 293 RU 7 PFANNENBERG PFANNENBERG...
Page 283: ...EB 210 EB 440 Pfannenberg GmbH Page 283 293 RU 6 1 1...
Page 284: ...EB 210 EB 440 Pfannenberg GmbH Page 284 293 RU 6 2 10 Eliwell SMP 6 3 7 7 1 7 2 30 7 3...
Page 285: ...EB 210 EB 440 Pfannenberg GmbH Page 285 293 RU 8 30...
Page 286: ...EB 210 EB 440 Pfannenberg GmbH Page 286 293 RU TD TD Pfannenberg 2 1 Klixon...
Page 287: ...EB 210 EB 440 Pfannenberg GmbH Page 287 293 RU...
Page 289: ...EB 210 EB 440 Pfannenberg GmbH Page 289 293 RU 9 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17...
Page 290: ...EB 210 EB 440 Pfannenberg GmbH Page 290 293 RU 10 10 1 10 2 Pfannenberg...