
Cypher SPM
User Guide
1. Select the cantilever holder.
l
Identify the correct cantilever holder for your exper-
iment.
l
This tutorial uses the standard AC Air holder, part#
901.705.
Tip:
To learn more about cantilever holders for the
standard scanner, see
Visual identification of SS can-
2. Prepare the cantilever mounting workspace.
l
Set out your changing station, tweezers, and can-
tilevers on a clean, well lighted surface.
l
Make sure that the changing station is labeled “Air”
(there is also a “Droplet” changing station for the
droplet holder.)
l
A low power binocular dissection stereoscope with
light source can be useful for some of the following
steps.
Tip:
Cleaning the tweezer tips with alcohol
improves the handling of the cantilevers.
3. Mount the cantilever holder in the changing station.
l
Carefully insert the cantilever holder as shown.
l
The V-shaped piece of metal on the back of the
holder slides into the dovetail joint on the changing
station. The cantilever should be pointing down.
l
If the cantilever holder does not slide in easily,
loosen the screw on the clamping mechanism.
19 Changing the cantilever on a standard scanner
Page 145 of 243