7-90 Installing replaceable parts
7. Route the cable between the PCP assembly brackets
so that the cable will be underneath the PCP assembly
when it is replaced. Refer to Figure 7-73.
Figure 7-73: Route cables under PCP assembly
Restoring the terminal to operation
Do the following to restore the terminal to operation so you
can test the smart card alert feature.
1.
Replace the control PCP in the PCP assembly, and the
PCP assembly in the terminal, as described in
Remov
ing the telephony and control PCP
and
Removing
the PCP assembly.
2. Connect the cable from the alerter module to connector
J37 on the smart card alert daughter board.
NTP: 506-6501-203 Document issue: 00.01 Status: Standard Date: January 1997
Summary of Contents for Millennium multi-pay M1211
Page 3: ...iv NTP 506 6501 203 Document issue 00 01 Status Standard Date January 1997...
Page 17: ...xviii Table of contents NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 21: ...t ATG 4 About this guide I NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 283: ...Customer orderable parts 9 11 Figure 9 4 Auxiliary view multi pay terminal chassis...
Page 304: ...A 16 Appendix A List of alarms NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 349: ......