Installing terminal software
3-11
CO test failure (continued)
•
When the line is set up properly, press
*
to retry
the answer supervision test, then carry out the
remaining steps of the INSTALL term inal-config
uration routine.
If the problem is not with the line, refer to the
appropriate troubleshooting section in Chapter 5.
Note:
The routine will not continue until the test
completes successfully.
15. Hang up the receiver.
This message
appears
on the VFD:
Press ¥ to start NCC
download
16. Press
*
to download information from the Millennium
Manager (NCC) to the terminal.
This message
appears
on the VFD:
Then this
message
appears on the
VFD:
Download in progress
*
Please wait
*
Stopping the download
If you want to stop a download after it is initiated,
press #.
Note:
You must stop the download before the
terminal connects to the modem pool. After the
terminal connects, the keypad is disabled.
(Continued on the next page)
Millennium multi-pay terminal installation, operation, and maintenance guide
Summary of Contents for Millennium multi-pay M1211
Page 3: ...iv NTP 506 6501 203 Document issue 00 01 Status Standard Date January 1997...
Page 17: ...xviii Table of contents NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 21: ...t ATG 4 About this guide I NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 283: ...Customer orderable parts 9 11 Figure 9 4 Auxiliary view multi pay terminal chassis...
Page 304: ...A 16 Appendix A List of alarms NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 349: ......