Installing replaceable parts 7-53
1.
This procedure assumes you have:
• followed the directions in
Preparing the terminal
for maintenance
and
Opening the terminal.
The
power is disconnected.
A
Be sure you upload CDRs before you do this
procedure.
You will need to run the INSTALL terminal-
configuration routine if you replace this unit.
• removed the coin validator as explained in
Replacing the coin validator
• escrows secured through the coin vault:
removed the coin box as explained in
Replacing
the vault door or coin box
later in this chapter, or
arrange for a coin pickup
2.
Top-mounted escrows:
Start at Step 3.
For escrows secured through the coin vault:
Remove the hex nut accessed through the coin vault on
the underside of the vault top through the coin box rail,
as indicated in Figure 7-44.
sigure 7-44: Coin escrow hex nut inside the coin vault
3. Push the securing tab, labelled in Figure 7-45, so it
clears the vault top in the return cutout.
Millennium multi-pay terminal installation, operation, and maintenance guide
Summary of Contents for Millennium multi-pay M1211
Page 3: ...iv NTP 506 6501 203 Document issue 00 01 Status Standard Date January 1997...
Page 17: ...xviii Table of contents NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 21: ...t ATG 4 About this guide I NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 283: ...Customer orderable parts 9 11 Figure 9 4 Auxiliary view multi pay terminal chassis...
Page 304: ...A 16 Appendix A List of alarms NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Page 349: ......