-
-
'15 • HM-T-246
(5) Operation control of CO2 heat pump water heater (Detection of reach and un-reach temperature)
CO
2
heat pump water heater operation control
Total number of sensors installed
pcs
pcs
pcs
pcs
Tht-
Tht-
Tht-
Tht-
Tht-
(6) Determination of hot water storage cylinder capacity
(a) Volume of water necessary to operate for 30 minutes continuously
panel is 0 kW and the heat source unit is in operation.
When CO
Operation start
Operation stop
Heat souce
unit operation
Heat souce
unit stop
No.1 sensor
Un-reach detection
No.2 sensor
Reach detection
No.1 sensor
(*1)
No.2 sensor
(*1)
Hot water storing operation
starts if this sensor detects
the un-reach state.
Hot water storing operation
starts if this sensor detects
the reach state.
The temperature stratification
moves up and down between
No.1 and No.2 sensors.
Floor
heating
panel
0kW
No.1
sensor
No.2
sensor
M
CO
2
heat pump
water heater
30kW × 2 units
Gas cooler
Water pump
Flow control valve
60˚C
25˚C
24.6L/min
60˚C
24.6L/min
AMP Air Conditioning
www.ampair.co.uk | [email protected]
Summary of Contents for ESA30E-25
Page 69: ... 15 HM T 246 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 71: ... 15 HM T 246 0 WARNING CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 85: ... 15 HM T 246 4 3 System diagram 㪄㪈㪌㪄 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 91: ... 15 HM T 246 0 CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...