-
-
'15 • HM-T-246
(2) Limited unit control
Demand rates on the display at that time are as follows.
(3) All units defrost control
[If the defrost starting conditions are satisfied on the master or slave unit on the master-sub system, it is
defrost operation on all units in the system.]
or remote control
Master
Sub
Sub
OFF
OFF
OFF
OFF
Master
Sub
-
-segment
Mente P C
①
Example:
Defrost starting conditions are satisfied!
Master slave communication cable
②
It is defrost operation on all units even if the starting conditions are not
satisfied. (This is implemented on the heat source water heater on which P13
is set at “1” on the 7-segment display.)
Master unit
Sub
①
Sub
②
Sub
③
<E xample of application>
of air blown out from other heat source unit.
When it is defrost operation after the end of hot water
storing at night
AMP Air Conditioning
www.ampair.co.uk | [email protected]
Summary of Contents for ESA30E-25
Page 69: ... 15 HM T 246 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 71: ... 15 HM T 246 0 WARNING CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 85: ... 15 HM T 246 4 3 System diagram 㪄㪈㪌㪄 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 91: ... 15 HM T 246 0 CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...