-
-
'15 • HM-T-246
make setting of the operation pattern with R/C according to the
hot water supply load to meet customer’s requirement
and start operation with
Caution
start operation.
the message of " It is in operation by standby" is displayed on the TOP
screen of R/C
Caution
Fill up operation is forcibly stopped by time up after 0 hours have elapsed.
h. Check the operation status of the heat pump water heater with MenteP C and check each function is
working properly.
Caution
Check following points
• P rotection control of compressor is activated or not.
• Check the controllability of hot water temperature by changing the setting temperature of
according to the inspection report of CO
heat pump water heater.
switch.
be implemented. P lease be careful.
please clean up the strainers in the hot water supply system
.
please implement [Water pump test run] and purge air again according to
the item a-c of working procedure mentioned above, and check no leak.
Screen -
Screen -
AMP Air Conditioning
www.ampair.co.uk | [email protected]
Summary of Contents for ESA30E-25
Page 69: ... 15 HM T 246 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 71: ... 15 HM T 246 0 WARNING CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 85: ... 15 HM T 246 4 3 System diagram 㪄㪈㪌㪄 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 91: ... 15 HM T 246 0 CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...