-
0
-
'15 • HM-T-246
3) Brazing
①
Discharge pipe
③
Gas injection pipe
②
Suction pipe
Be sure to do masking around the brazing place.
(The places not only around discharge pipe but also around
suction pipe and gas injection pipe)
N ote: Be careful to braze pipes without any gas leak later on,
because the pipe is thicker and pipe insertion depth is
deeper and then upper space is rather tight for brazing
work.
AMP Air Conditioning
www.ampair.co.uk | [email protected]
Summary of Contents for ESA30E-25
Page 69: ... 15 HM T 246 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 71: ... 15 HM T 246 0 WARNING CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 85: ... 15 HM T 246 4 3 System diagram 㪄㪈㪌㪄 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Page 91: ... 15 HM T 246 0 CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...