OPERATION
MACHINE OPERATIONS AND CONTROLS
3-133
4.
Loosen mounting bolt (4) of the camera and adjust mount-
ing angle (A) of the camera so that the center line of
mounting bolt (4) is aligned with fourth-from-bottom scale
(B).
REMARK
Part of the machine is shown on the monitor screen.
5.
After adjusting, tighten bolt (4).
Tightening torque: 3-5 Nm (0.3-0.5 kgm)
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...