MAINTENANCE PROCEDURE
MAINTENANCE
4-42
CHECK AND MAINTENANCE AIR CONDITIONER
4
Check Level of Refrigerant (gas)
WARNING
If the refrigerant used in the air conditioner gets into your eyes or on your hands, it may cause loss of
sight or frostbite. Do not touch the refrigerant. Never loosen any part of the refrigerant circuit.
Do not bring any flame close to any point where the refrigerant gas is leaking.
If the level of the refrigerant (gas) is low, the cooling effect will
be reduced. Run the engine at high idle, and check the flow of
the refrigerant gas (R134a) in the refrigerant circuit through the
sight glass (2) (inspection window) of the receiver (1) when the
cooler is running at high speed.
(A) No bubbles in refrigerant flow: Suitable
(B) Some bubbles in flow (bubbles pass continuously):
Lack of refrigerant
(C) Colorless, transparent: No refrigerant
REMARK
When there are bubbles, the refrigerant gas level is low, so
contact your Komatsu distributors to have refrigerant added. If
the air conditioner is run with the refrigerant gas level low, it will
cause damage to the compressor.
Inspection During Off Season
Even during the off-season, operate the air conditioner for 3 to 5 minutes once a month to maintain the oil film at all
parts of the compressor.
Inspection and Maintenance Items
Check, maintenance items
Content of check, maintenance
Guideline for maintenance inter-
val
Refrigerant (gas)
Charge amount
Twice a year (spring, autumn)
Air conditioner condenser
Clogged fins
Every 500 hours
Compressor
Operating condition
Every 4000 hours
V-belt
Damage, tension
Every 250 hours
Blower motor, fan
Operating condition
(does it make abnormal noise?)
When required
Control mechanism
Operating condition (does it function normally?)
When required
Piping mounts
Mounting condition, looseness at tightening or
connecting portions, leakage of gas, damage
When required
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...