MAINTENANCE SCHEDULE
MAINTENANCE
4-18
MAINTENANCE SCHEDULE
4
If the machine is equipped with a hydraulic breaker, the maintenance schedule for some parts will be different. For
details, see “MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER (4-20)“ to confirm the correct maintenance
schedule when carrying out maintenance.
MAINTENANCE SCHEDULE CHART
4
INITIAL 1000 HOURS MAINTENANCE (ONLY AFTER THE FIRST 1000 HOURS)
CHECK ENGINE VALVE CLEARANCE, ADJUST ........................................................................................... 4-81
4
WHEN REQUIRED
CHECK, CLEAN AND REPLACE AIR CREANER ELEMENT.......................................................................... 4-22
4
CLEAN INSIDE OF COOLING SYSTEM .......................................................................................................... 4-28
4
CHECK AND TIGHTEN TRACK SHOE BOLTS ............................................................................................... 4-32
4
CHECK AND ADJUST TRACK TENSION ........................................................................................................ 4-33
4
REPLACE BUCKET TEETH (VERTICAL PIN TYPE)....................................................................................... 4-35
4
REPLACE BUCKET TEETH (HORIZONTAL PIN TYPE) ................................................................................. 4-38
4
REPLACE BUCKED SIDE CUTTER SHROUD ................................................................................................ 4-39
4
ADJUST BUCKET CREARANCE ..................................................................................................................... 4-40
4
CHECK WINDOW WASHER FLUID LEVEL, ADD FLUID ............................................................................... 4-41
4
CHECK AND MAINTENANCE AIR CONDITIONER......................................................................................... 4-42
4
WASHING WASHABLE FLOOR....................................................................................................................... 4-43
4
BLEEDING AIR FROM HYDRAULIC SYSTEM ................................................................................................ 4-46
4
CHECKS BEFORE STARTING
EVERY 50 HOURS MAINTENANCE
LUBRICATING .................................................................................................................................................. 4-49
4
EVERY 250 HOURS MAINTENANCE
LUBRICATE SWING CIRCLE........................................................................................................................... 4-50
4
CHECK LEVEL OF BATTERY ELECTROLYTE ............................................................................................... 4-51
4
CHECK AIR CONDITIONER COMPRESSOR BELT TENSION, ADJUST....................................................... 4-53
4
EVERY 500 HOURS MAINTENANCE
CHECK OIL LEVEL IN SWING MACHINERY CASE, ADD OIL ....................................................................... 4-54
4
CHECK OIL LEVEL IN FINAL DRIVE CASE, ADD OIL.................................................................................... 4-55
4
LUBRICATING .................................................................................................................................................. 4-56
4
REPLACE FUEL PRE-FILTER CARTRIDGE ................................................................................................... 4-58
4
CHECK SWING PINION GREASE LEVEL, ADD GREASE ............................................................................. 4-61
4
CHANGE OIL IN ENGINE OIL PAN, REPLACE ENGINE OIL FILTER CARTRIDGE...................................... 4-62
4
CLEAN AND INSPECT RADIATOR FINS, OIL COOLER FINS, AFTER COOLER FIN
AND CONDENSER FINS ................................................................................................................................ 4-64
4
CLEAN AIR CONDITIONER FRESH/RECIRC FILTERS ................................................................................. 4-66
4
REPLACE BREATHER ELEMENT IN HYDRAULIC TANK .............................................................................. 4-67
4
REPLACE HYDRAULIC TANK ADDITIONAL BREATHER ELEMENT ............................................................ 4-68
4
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...