MAINTENANCE PROCEDURE
MAINTENANCE
4-56
LUBRICATING
4
NOTICE
q
If any abnormal noise is generated from any greasing point, carry out greasing regardless of the
greasing interval.
q
Carry out greasing every 10 hours for the first 50 hours on a new machine.
q
After the machine was subjected to jobs in the water, be sure to grease the wet pins.
q
When carrying out heavy-duty operations, such as hydraulic breaker operations, carry out the greas-
ing every 100 hours.
1.
Set the machine to the greasing posture shown on the
right, lower the work equipment to the ground, then stop
the engine.
2.
Using a grease pump, pump in grease through the grease
fittings shown by arrows.
3.
After greasing, wipe off any old grease that was pushed
out.
(1) Boom cylinder rod pin (2 places)
(2) Arm cylinder foot pin (1 places)
(3) Boom-Arm coupling pin (1 place)
(4) Arm cylinder rod end (1 place)
(5) Bucket cylinder foot pin (1 place)
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...