SPECIFICATIONS
HIGH REACH DEMOLITION MANUAL
7-62
WARNING
This table is provided for guidance only. The demolition dig boom is not intended for lifting operations
Demolition Dig Boom - Straight Position
7
Lifting capacity data with 2.6m & 3.2m arm, 700mm trackshoes, 1014 kg bucket
MODEL
ARM
(B)
HEIGHT(m)
(A) MAX
10.5
9.0
7.5
6.0
4.5
3.0
OF
OS
OF
OS
OF
OS
OF
OS
OF
OS
OF
OS
OF
OS
PC
350
LCD-8
2.
6m
9.0
*7650
5650
*10350
6800
*10750
10300
*9850
*9850
7.5
*7050
4400
7550
4700
10650
6800
*10850
10100
*9700
*9700
6.0
6150
3700
7500
4650
10350
6500
*13900
9500
*16750
15200
4.5
5550
3300
7300
4500
9900
6100
14200
8650
3.0
5300
3100
5500
3250
7100
4250
9450
5700
13300
7850
1.5
5200
3050
5400
3150
6900
4100
9050
5350
12650
7300
0
5350
3100
5400
3150
6750
3950
8850
5200
12450
7100
-1.5
*5650
3350
6750
3950
8800
5150
*12050
7100
-3.0
*5650
4050
*7850
5250
*9150
7300
3.
2m
9.0
*5250
4750
*8300
6950
*8200
*8200
7.5
*4900
3800
7650
4800
*8700
6900
*8300
*8300
*7300
*7300
6.0
*4750
3200
5600
3350
7550
4700
*9950
6600
*10100
9700
*9950
*9950
4.5
*4700
2900
5550
3300
7350
4500
10000
6200
14500
8900
3.0
4750
2700
5450
3200
7050
4250
9500
5750
13550
8050
1.5
4650
2650
5300
3050
6850
4000
9050
5350
12800
7400
0
4750
2700
5250
3000
6650
3850
8800
5100
12400
7050
-1.5
5050
2900
5250
3000
6600
3800
8650
5000
12300
6950
*9100
*9100
-3.0
6650
3850
8700
5050
*10500
7050
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...