TROUBLES AND ACTIONS
OPERATION
3-204
LIGHTWEIGHT TOWING HOLE
3
WARNING
q
The shackle must always be used.
q
Hold the wire rope level and direct it straight to the track frame.
q
Move the machine slowly and be careful not to apply any sudden load to the wire rope.
There is a hole in the track frame to fit the shackle when towing
light objects.
Permissible towing load:
Max. 108,000 N (11,000 kgf)
SEVERE JOB CONDITION
3
q
When carrying out digging operations in water, if the work equipment mounting pin goes into the water, carry
out greasing every time the operation is carried out.
q
For heavy-duty operations and deep digging, carry out greasing of the work equipment mounting pins every
time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again.
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...