ATTACHMENTS AND OPTIONS
MACHINE READY FOR ATTACHMENT
6-19
Attachment Installation
6
1.
Remove the bucket.
For bucket dismounting procedure, see “BUCKET REPLACEMENT AND INVERSION (3-177)“.
2.
Place the attachment in a horizontal position, then install to
the arm with pin (A) and then pin (B).
3.
Lower the attachment to the ground and stop the engine.
4.
Turn the starting switch to the ON position (B), then set the
lock lever to the FREE position (F).
5.
After carrying out Step 4, operate each work equipment
control lever and attachment control pedal fully to the front,
rear, left, and right 2 or 3 times within 15 seconds to
release the internal pressure in the hydraulic circuit.
6.
Set the lock lever to LOCK position (L).
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...