MAINTENANCE PROCEDURE
MAINTENANCE
4-50
EVERY 250 HOURS MAINTENANCE
4
Maintenance for every 50 hours service should be carried out at the same time.
LUBRICATE SWING CIRCLE
4
1.
Lower the work equipment to the ground.
2.
Using a grease pump, pump in grease through the grease
fittings shown by arrows. (2 places)
3.
After greasing, wipe off any old grease that was pushed
out.
Summary of Contents for PC350LC-8
Page 2: ......
Page 3: ...FOREWORD 11...
Page 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Page 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Page 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Page 367: ...SPECIFICATIONS 15...
Page 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Page 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Page 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 501: ...COLOPHON 18...